Class E Crane Modernization

Class E Crane Modernization

Posted by Eric Brown

This case study outlines the upgrade of an existing 30-ton capacity Class E magnet service crane. Originally sold as a cab controlled static stepless crane with wound rotor motors, the […]

Read more

Magnetek Crane Modernization Big Bang for the Buck!

Magnetek Crane Modernization Big Bang for the Buck!

Posted by Eric Brown

We love nothing better than to completely modernize an existing crane to gain lower maintenance costs and more production. But sometimes the demands of the business means that improvements must […]

Read more

Bridge Crane Modernization Case Study: Before you replace – REBUILD!

Bridge Crane Modernization Case Study: Before you replace – REBUILD!

Posted by Eric Brown

Just a reminder to the overhead crane users out there that sometimes you can get the same results for less money by rebuilding crane components instead of buying new. Take […]

Read more

Old Crane Components Get New Life With Ace World

Old Crane Components Get New Life With Ace World

Posted by Eric Brown

If you have the capacity to fabricate and have leftover or extra crane components such as box girders, endtrucks, or hoists, you can often save money while getting additional lifting […]

Read more

Modernization of a 25-Ton Whiting Crane

Modernization of a 25-Ton Whiting Crane

Posted by Eric Brown

Engineered Lifting recently received a request from a customer to provide a competitive bid to replace “a worn out” 10 year old Yale FEW model 25-ton hoist. Another prospective bidder told […]

Read more

Engineered Lifting Systems LLC
601 Gravois Bluffs Blvd.
Suite O
Fenton, MO 63026, USA
Phone 866-756-1200
Fax 866-756-1202

Page