Patented Track Castellated Beams
Posted by Eric Brown
This bulletin is generated as reference and notice for anyone that has any brand of patented track (also called hardened track) with a castellated (window) construction, or “skip welded” beams. […]
Rated Load Test Performed on New Equipment
Posted by Eric Brown
15-Ton Double Girder Crane Load Tested. When installing a new, substantially repaired, or modified overhead crane or hoist into service, a rated load test shall be performed. OSHA states […]
Crane Two Blocking Problem Solved with Hubbell Limit Switch
Posted by Eric Brown
Use of Power Circuit Limit Switches with Flux Vector Drives in Molten Metal Hoist Applications Recently, Engineered Lifting Systems fielded a call from a customer with production that includes the hoisting […]
Proper Overhead Crane Inspections Runway How To
Posted by Eric Brown
Proper Overhead Crane Inspections: Don’t forget the runway! During the life of your top running or underhung crane, you need to inspect the condition of the runway on which it […]