30-Ton Overhead Crane Gets New Girder Connections
Posted by Eric Brown
During a recent service inspection, Engineered Lifting System’s service technicians discovered substantial cracks in the girder connections on a double girder top running 30-ton. All four girder connections were cracked […]
Rated Load Test Performed on New Equipment
Posted by Eric Brown
15-Ton Double Girder Crane Load Tested. When installing a new, substantially repaired, or modified overhead crane or hoist into service, a rated load test shall be performed. OSHA states […]
Custom Replacement Endtruck Delivered in 4 Weeks
Posted by Eric Brown
This endtruck could not be repaired and maintain alignment. Holy Grand Canyon Crack! We recently received a phone call from a good customer looking to repair a bogie […]
Magnetek’s “Ultra-Lift” Hoist Control with Ace World Trolley-Hoists
Posted by Eric Brown
Recently, Engineered Lifting Systems completed a multiple crane project for a large Midwest steel supply company. The cranes are used for the loading and unloading of many different sizes, shapes […]
Magnetek Crane Modernization for Coil Handling Cranes
Posted by Eric Brown
After securing emergency parts from Germany for a new customer (see Coupling Inserts Found!), Engineered Lifting Systems was selected to put two 25-ton cranes back into active coil handling service […]