
Magnetek Series 3 Drives Using “Motor 2” Option
Posted by Eric Brown
Magnetek Series 3 Drives Using “Motor 2” Option In the summer of 2018, Engineered Lifting Systems was contracted to travel to a rather remote location in Panama to help a […]

Magnetek Brake Circuit Fusing
Posted by Eric Brown
Magnetek Brake Circuit Fusing I thought I would share a practice that we at Engineered Lifting Systems use when ordering or reviewing a complete Magnetek variable frequency drive panel or […]

Runway Electrification Isolation Sections Improves Production and Provides Safety
Posted by Eric Brown
Runway Electrification Isolation Sections Improves Production and Provides Safety It is not unusual to have multiple overhead cranes on the same runway. While maintaining and repairing these cranes, having a […]

25-Ton Double Girder Top Running Bridge Crane
Posted by Eric Brown
25-ton double girder top running bridge crane with Ace World trolley/hoist unit providing Class D service for this metals supply center. All Magnetek controls, MLTX Telemotive radio remote control, conductor […]

Eads Bridge Crane Systems
Posted by Eric Brown
Eads Bridge Crane Systems The Eads Bridge located in St. Louis Missouri has been a landmark since its completion in 1874. At the time of construction the bridge was longest […]