Engineered
Lifting Case Study
April 27, 2010
Old Crane
Components Get New Life With Ace World
If you have the capacity to
fabricate and have leftover or extra crane
components such as box girders, endtrucks,
or hoists, you can often save money while
getting additional lifting capacity in your
shop! Engineered Lifting Systems with Ace
World Companies can provide an engineering
study of the existing equipment, and coupled
with new Ace World design and / or
components, we can develop a complete
overhead crane. We can analyze capacities,
check dimensions, and provide a clear vision
to crane construction.
These pictures show a fabricator that had
two (2) old 25-ton trolley/hoists, but
needed a box girder design endtrucks and
detailing for complete cranes.
The customer fabricated their own box
girders right from our drawings, constructed
the girder connections as Ace detailed, and
even fabricated an auxiliary trailer trolley
using an old hoist they bought at an
auction! ELS and Ace World provided the
trolley endtrucks, bogie bridge endtrucks
and truck ties.

Could these old box girders be used for a
new crane? – You Bet!
This customer had two old box girders,
but needed a special complete crane.
Engineered Lifting Systems along with Ace
World provided a solution based on reusing
the box girders and providing new endtrucks
and a parallel mounted drum Ace Built-up
trolley / hoist. The customer used our
drawings to assemble, and Engineered Lifting
finished the project by wiring the crane
right in the customer’s shop!

How about the completed crane?

Special parallel mounted drum is exactly
what was needed
If you have old crane components or
equipment and need a new complete crane,
just call the Crane Doctor and he can bring
that old equipment back to life. Contact Eric Brown @ 866-756-1200 or email
ebrown@engineeredlifting.com
|