Home
About Us
Ace Cranes & Hoists
Ace Applications
Gorbel Cranes
Shaw Box Hoists
J. D. Neuhaus Hoists
Monorail Air Hoists
Budgit Hoists
Yale Hoists
Mondel Brakes
Modernization
Electromotive
Telemotive
New at Telemotive
Surplus Equipment
Case Study Archive
Current Case Study
Crane Crew Shirts
Contact Us

EMAIL NEWSLETTER
Sign up, it's FREE!

 

Crane Technician
Job Opportunity

 

Engineered Lifting Systems, LLC

1630 Headland Drive
Fenton, MO 63026
USA

 

Phone 866-756-1200

Fax 866-756-1202

sales@
engineeredlifting.com

 

Last Update
November 06, 2008

 
 
 

Web Services by
Ron Castle Webs
& SEO Optimization

Site Map

Engineered Lifting Systems News
Interesting News Items from the World of Industrial Lifting
   

July 19, 2007
Custom Crane Installation - Gorbel Cranes Are Fast!
by Eric Brown

Recently, Engineered Lifting Systems was contracted to design, provide and install a Gorbel Workstation Crane System. The basis for the system was to furnish a 2,000# capacity runway for two 1,000# Gorbel ergonomic bridge cranes. We took several pictures along the way to help show how the installation progressed.

With a survey at the time of order entry, we determined the exact dimensions of the building to make sure the Gorbel system was ordered to fit into the building and provide the hook travel requirements.

 

This installation was made easier with an open room at the time of installation.

The Gorbel system is laid out and ready for installation.

Before erecting the columns, we needed to lay out where the columns were going to be placed.
Every system starts with a good construction line.

After making sure that the column grid was laid out precisely, and the centers of the columns were marked, it was time to start putting up the columns.

Once a column was up, it was time to drill holes into the floor to use for the anchor bolts.

After anchoring each of the six columns, they were brought into plumb. The metal shipping straps that were used to hold the columns together for shipment are very handy shim material.

Once all six columns are up and plumb, it is time to place the headers.

Here is a picture of Dane Vance in the action bolting up the first header.

After installing each of the headers, it was time to put up the runway. And roll on the crane. The finished project up and ready for customer use!

Remember, although Gorbel offers standard crane systems, Engineered Lifting Systems can supply a custom design to allow column placement and hook travel to match YOUR needs.

Contact Engineered Lifting today to discuss your application! We handle the complete Gorbel crane product line including bridge cranes, monorail systems, jib cranes, articulating jib cranes and more.